WAParking

Regulation

Odisha's draft parking policy: what builders should check

Odisha's draft Urban Parking Policy 2026 is open for comment. Off-street parking would cost 25% less, and new multi-level lots would need EV and cycle bays

WAParking Research Desk 22 Nov 2026 5 min read Odisha Bhubaneswar parking policy multi-level parking EV charging off-street parking
Odisha's draft parking policy: what builders should check

Why it matters

Most parking rules that builders follow sit in building bye-laws. They say how many bays a project must provide. Odisha's new draft works on the other side of the problem. It sets out how cities should manage parking on streets and in public lots, and how that should be priced.

The push comes from growth in vehicles. The state registered a 65 per cent growth in vehicular numbers in six years, according to PTI. For anyone planning a project in Bhubaneswar, Cuttack or other Odisha towns, the draft shows where state policy is heading.

This is a draft. It is not yet in force.

What the draft says

Status and deadline. The Housing and Urban Development Department has published the draft on its official website, inviting suggestions and objections within 15 days of its publication in the Odisha Gazette. The department's notification page lists the Draft Odisha Urban Parking Policy, 2026, Notification No. 10582. That page shows a date of 13/04/2026, while news reports say the draft was released on 17 November. One commentator says the draft was issued by the department on November 13, 2026. If 13 November is the Gazette date, the 15-day window ends around 28 November. Check the Gazette copy for the exact date.

Local parking plans. Urban local bodies will prepare area-specific parking plans, designate parking zones, fix user charges and enforce parking regulations.

Pricing. Parking fees would vary according to location, demand and duration, with off-street parking priced 25 per cent lower than on-street parking. One commentator reads the draft as setting a base parking fee linked to annual land values. He adds that it uses progressive time multipliers and a target 85 percent peak occupancy rate.

New multi-level lots. The draft proposes EV charging and bicycle parking at new off-street and multi-level parking facilities. It also proposes park-and-ride facilities near major public transport corridors and marked spaces for persons with disabilities.

Proof of parking. The most talked-about proposal sits in the registration rules. Vehicle owners would have to prove they have access to a designated parking space before registering a new private vehicle. The draft also introduces a Residential Parking Permit system for dense localities and proposes a full ban on parking on residential roads narrower than 12 metres. Both items come from one news report. Read the draft text before you rely on them.

Early criticism. A former Member of the Board of Revenue has suggested a phased pilot instead of an immediate statewide proof-of-parking rule. He proposes notified zones of Bhubaneswar and Cuttack backed by a verified digital database. His concern is that without such a registry the rule could encourage forged affidavits.

How it fits with Odisha's building standards

The draft does not change how many bays a project must provide. That is still set by the building standards. The Odisha Planning and Building Standard notification of 2020, published in the Gazette, lists a stacked or multi-level or automated parking option among the ways to provide parking. It also says a minimum of 2% of the total parking space shall be demarcated for bicycle parking. Those standards may have been amended since, so confirm the current text with the planning authority.

The two documents therefore work together. The building standards decide how many bays a project must build and in what form. The draft policy decides how public and shared parking is priced and managed around it.

What it means for a builder or society

These points are our reading of the draft, not statements from it.

  • Bays may become a registration matter. If proof of parking survives into the final policy, a legal, documented bay will matter more to buyers. Projects that count bays loosely, or sell bays that are not on the sanctioned plan, could face questions.
  • Public multi-level lots will carry extra requirements. Any lot built with a municipal body, or under a concession, should allow for EV charging and bicycle racks from day one. Adding them later costs more.
  • Cheaper off-street fees favour paid lots. A 25% gap against the street helps operators of off-street lots. It could also make a paid, managed lot easier to justify near commercial clusters.
  • Narrow lanes need on-plot parking. If parking on roads under 12 metres is banned, residents of older streets must park inside their own plots or in a shared facility. That raises demand for compact solutions on small plots.
  • Details are still open. The draft leaves much to each urban local body. Fees, zones and rules may differ between towns.

What to do now

  1. Read the draft. Download it from the H&UD website at urban.odisha.gov.in. Note the Gazette date and count 15 days from it.
  2. Send comments if you are affected. Feedback can go in person, by post to the Housing & Urban Development Department, or by email to hudsec.or@od.gov.in. Useful points include how mechanical parking should be counted, who certifies a bay for registration, and how a society's shared bays are recorded.
  3. Audit your current projects. Compare the bays on the sanctioned plan, the bays built and the bays sold or allotted. Fix gaps before a registration rule makes them visible.
  4. Plan EV and bicycle provision. For any new multi-level facility, show charging points and bicycle bays in the layout and the electrical load.
  5. Test your plot. If your plot is tight, compare ground-level, stack, puzzle and tower layouts against the 2020 standards. WAParking offers a free parking yield study, which is one option for doing this.

This article is general information, not legal advice.

Related

More from Insights

Chat with us